8600 South Storm Drain Project - Sandy City Department of Public Utilities
BC&A designed a large storm drain outfall for Sandy City
in the 8600 South Street corridor. This project included the design and
construction management services for approximately 20,000 linear feet of
main storm drain pipeline that extends from 1700 East to the Jordan River.
Pipe diameters ranged from 24 inches to 72 inches. The project also
included constructing or modifying three storm drain detention facilities;
crossing the TRAX railroad, three canals, I-15, two State roads, and two
capped superfund sites.
The project required close coordination with Midvale
City, Salt Lake City, UDOT, multiple sewer districts, Salt Lake County,
several State Agencies, several Sandy City Departments, multiple private
property owners, and many utility companies to meet the aggressive design
and construction schedule for this $8.5 million construction project.