Point of the Mountain Water Transmission System Facilities Project - Metropolitan Water District of Salt Lake & Sandy (MWDSLS)

BC&A is currently developing a conceptual level design for the new water transmission system facilities required to connect the future Point of the Mountain Water Treatment Plant (POMWTP) to the LCWTP. The estimated construction cost for the project is $90 million.

The project involves a detailed routing study for the Point of the Mountain Aqueduct (approximately 63,000 feet of 60-inch plus pipeline), and conceptual level design of the aqueduct, four booster pump stations, a raw water intake structure, and raw and finished water storage facilities. BC&A is managing an extensive coordination effort with project “stake holders” that will be affected by the new facilities, including Salt Lake City, Sandy City, Draper City, JVWCD, Central Utah Water Conservancy District, Salt Lake County, Utah Department of Transportation, Dimple Dell Park Advisory Board, neighborhood associations, and public advisory groups. The project is scheduled for completion by mid-summer of 2006.

     
© 2003 Bowen, Collins & Associates.