All lanes are now open on Ustick Road between Cleveland Boulevard and I-84! BC&A provided hydraulic modeling and design for this new structure, delivering key improvements to enhance safety and connectivity. The work included:
- Replacing the Ustick bridge over Indian Creek and adding a sidewalk,
- Widening Ustick Road to two lanes in each direction with a center median between the railroad and Crow Drive,
- Replacing and improving the railroad crossing.
Check out the video for project progress over the last five months, and learn more about the project here.