Projects

At BC&A, we pride ourselves on designing and developing projects that help our communities thrive.

Innovative Projects Shaping Water, Wastewater & Infrastructure

We strive to develop innovative solutions to meet the needs of our clients.
Click on the links below to learn more about some of the exciting projects we have completed.

Green River, UT

Green River Tusher Diversion EWP

Bowen Collins & Associates (BC&A) completed design and construction management of the Green River / Tusher Diversion Emergency Watershed Protection (EWP) Project for the Utah Department of Agriculture and Food.

Moab, UT

Moab City Water Reclamation Facility

BC&A provided engineering services for facility planning, preliminary engineering, and environmental assessment and permits, detailed design and bidding, and construction management services for the new Moab Water Reclamation Facility (WRF).

State of Utah

Water Use Data Collection

Bowen Collins & Associates was tasked with examining municipal and industrial water-use information that was submitted to the State of Utah in 2005, 2010, and 2015.

Park City, UT

Silver Creek Trunkline Sewer Rehabilitation

BC&A provided planning, design and construction engineering to rehabilitate the Silver Creek trunk sewer line in Park City, Utah.

West Jordan, UT

Southwest Aqueduct Reach 1

BC&A developed the design and is currently providing construction management for the Southwest Aqueduct Reach 1 Project (SWA-1).

Bear River, UT

Bear River Water Development Study

Bowen Collins & Associates has been working with the State of Utah on the Bear River Pipeline Project to implement the Bear River Development Act.

Salt Lake City, UT

Terminal Reservoir Project

Terminal Reservoir is owned and operated by the Metropolitan Water District of Salt Lake & Sandy (District). The District began planning for replacement of the reservoir in 1998 and worked through the detailed planning and design phases of the project over a three-year period from 2008 to 2011.

Utah County, UT

Historic Utah Lake Pump Station Project

BC&A completed redesign of the existing Utah Lake Pump Station located at the outlet of Utah Lake. The construction of the project was completed in 2013. The historic pump station, which remains in place, is over 100 years old.

Sandy, UT

Dry Creek Restoration Project

Bowen Collins & Associates (BC&A) completed the design, environmental permitting and construction management of 1,200 linear feet of the Dry Creek channel realignment near the Sandy City South Town Mall

Summit County, Utah

Fisher Ranch WTP

Jordanelle Special Service District contracted with BC&A to perform the design of a new surface water treatment plant taking raw water from the Provo River just downstream of Jordanelle Reservoir. The design portion included the initial treatment evaluation study, water quality testing programs, 3 months of pilot testing, budgetary planning, preliminary design, and final design. […]

Sandy, UT

Heritage 10 MG Tank & Park

BC&A completed design of a 5.0 MG AWWA D110 prestressed, circular concrete tank for the City of Sandy. The new tank is located in Flat Iron Mesa Park, a highly used and very popular park in Sandy City.

Sandy, Utah

Sandy City Amphitheater Concession Expansion

BC&A managed and designed the expansion of a one-acre plaza and concession area located east of the existing Sandy City Amphitheater. The new multi-level plaza creates inviting spaces for community gatherings and vendor activities, anchored by a modern concession building that complements the architectural style of the amphitheater. The design integrates retaining walls, ambient lighting, […]

Delta, Utah

DMAD Dam Rehabilitation, Phase II Spillway Replacement

The DMAD Canal Company contracted Bowen Collins & Associates for the design planning, design, permitting, bidding, and construction period services for the Spillway Replacement Project on the DMAD Reservoir. The new design required spillway that was equipped to pass the probable maximum flood and constructed to resist future erosion with increased foundation stability. After multiple […]

Levan, Utah

Sevier Bridge Dam Rehabilitation Project

Bowen Collins & Associates led the planning, design, and construction period services for the Sevier Bridge Dam Rehabilitation Project. Owned and operated by the CSBR Company in Delta, Utah, the Sevier Bridge Dam has been impounding Sevier River water for over 120 years and is the largest privately-owned reservoir in Utah. The reservoir serves as […]

St. George, Utah

St. George Emergency Watershed Protection

On August 23, 2020, a summer thunderstorm moved into the St. George, Utah area and rain began to fall throughout the City of St. George (City) and neighboring cities. This intense rainfall event caused significant flooding in the urban areas of St. George City damaging homes, causing erosion to the waterways, and leaving a significant […]