Projects

At BC&A, we pride ourselves on designing and developing projects that help our communities thrive.

Innovative Projects Shaping Water, Wastewater & Infrastructure

We strive to develop innovative solutions to meet the needs of our clients.
Click on the links below to learn more about some of the exciting projects we have completed.

Green River, UT

Green River Tusher Diversion EWP

Bowen Collins & Associates (BC&A) completed design and construction management of the Green River / Tusher Diversion Emergency Watershed Protection (EWP) Project for the Utah Department of Agriculture and Food.

Moab, UT

Moab City Water Reclamation Facility

BC&A provided engineering services for facility planning, preliminary engineering, and environmental assessment and permits, detailed design and bidding, and construction management services for the new Moab Water Reclamation Facility (WRF).

State of Utah

Water Use Data Collection

Bowen Collins & Associates was tasked with examining municipal and industrial water-use information that was submitted to the State of Utah in 2005, 2010, and 2015.

Park City, UT

Silver Creek Trunkline Sewer Rehabilitation

BC&A provided planning, design and construction engineering to rehabilitate the Silver Creek trunk sewer line in Park City, Utah.

West Jordan, UT

Southwest Aqueduct Reach 1

BC&A developed the design and is currently providing construction management for the Southwest Aqueduct Reach 1 Project (SWA-1).

Bear River, UT

Bear River Water Development Study

Bowen Collins & Associates has been working with the State of Utah on the Bear River Pipeline Project to implement the Bear River Development Act.

Salt Lake City, UT

Terminal Reservoir Project

Terminal Reservoir is owned and operated by the Metropolitan Water District of Salt Lake & Sandy (District). The District began planning for replacement of the reservoir in 1998 and worked through the detailed planning and design phases of the project over a three-year period from 2008 to 2011.

Utah County, UT

Historic Utah Lake Pump Station Project

BC&A completed redesign of the existing Utah Lake Pump Station located at the outlet of Utah Lake. The construction of the project was completed in 2013. The historic pump station, which remains in place, is over 100 years old.

Sandy, UT

Dry Creek Restoration Project

Bowen Collins & Associates (BC&A) completed the design, environmental permitting and construction management of 1,200 linear feet of the Dry Creek channel realignment near the Sandy City South Town Mall

Sandy, UT

Flat Iron Tank

BC&A completed design of a 5.0 MG AWWA D110 prestressed, circular concrete tank for the City of Sandy. The new tank is located in Flat Iron Mesa Park, a highly used and very popular park in Sandy City.

Protected: Watershed Projects

There is no excerpt because this is a protected post.