At BC&A, we pride ourselves on designing and developing projects that help our communities thrive.
At BC&A, we pride ourselves on designing and developing projects that help our communities thrive.
We strive to develop innovative solutions to meet the needs of our clients. Click on the links below to learn more about some of the exciting projects we have completed.
Green River, UT
Bowen Collins & Associates (BC&A) completed design and construction management of the Green River / Tusher Diversion Emergency Watershed Protection (EWP) Project for the Utah Department of Agriculture and Food.
			Moab, UT
BC&A provided engineering services for facility planning, preliminary engineering, and environmental assessment and permits, detailed design and bidding, and construction management services for the new Moab Water Reclamation Facility (WRF).
			State of Utah
Bowen Collins & Associates was tasked with examining municipal and industrial water-use information that was submitted to the State of Utah in 2005, 2010, and 2015.
			Park City, UT
BC&A provided planning, design and construction engineering to rehabilitate the Silver Creek trunk sewer line in Park City, Utah.
			West Jordan, UT
BC&A developed the design and is currently providing construction management for the Southwest Aqueduct Reach 1 Project (SWA-1).
			Bear River, UT
Bowen Collins & Associates has been working with the State of Utah on the Bear River Pipeline Project to implement the Bear River Development Act.
			Salt Lake City, UT
Terminal Reservoir is owned and operated by the Metropolitan Water District of Salt Lake & Sandy (District). The District began planning for replacement of the reservoir in 1998 and worked through the detailed planning and design phases of the project over a three-year period from 2008 to 2011.
			Utah County, UT
BC&A completed redesign of the existing Utah Lake Pump Station located at the outlet of Utah Lake. The construction of the project was completed in 2013. The historic pump station, which remains in place, is over 100 years old.
			Sandy, UT
Bowen Collins & Associates (BC&A) completed the design, environmental permitting and construction management of 1,200 linear feet of the Dry Creek channel realignment near the Sandy City South Town Mall
			Summit County, Utah
Jordanelle Special Service District contracted with BC&A to perform the design of a new surface water treatment plant taking raw water from the Provo River just downstream of Jordanelle Reservoir. The design portion included the initial treatment evaluation study, water quality testing programs, 3 months of pilot testing, budgetary planning, preliminary design, and final design. […]
			Sandy, UT
BC&A completed design of a 5.0 MG AWWA D110 prestressed, circular concrete tank for the City of Sandy. The new tank is located in Flat Iron Mesa Park, a highly used and very popular park in Sandy City.
			Sandy, Utah
BC&A managed and designed the expansion of a one-acre plaza and concession area located east of the existing Sandy City Amphitheater. The new multi-level plaza creates inviting spaces for community gatherings and vendor activities, anchored by a modern concession building that complements the architectural style of the amphitheater. The design integrates retaining walls, ambient lighting, […]
			Delta, Utah
The DMAD Canal Company contracted Bowen Collins & Associates for the design planning, design, permitting, bidding, and construction period services for the Spillway Replacement Project on the DMAD Reservoir. The new design required spillway that was equipped to pass the probable maximum flood and constructed to resist future erosion with increased foundation stability. After multiple […]
			Levan, Utah
Bowen Collins & Associates led the planning, design, and construction period services for the Sevier Bridge Dam Rehabilitation Project. Owned and operated by the CSBR Company in Delta, Utah, the Sevier Bridge Dam has been impounding Sevier River water for over 120 years and is the largest privately-owned reservoir in Utah. The reservoir serves as […]
			St. George, Utah
On August 23, 2020, a summer thunderstorm moved into the St. George, Utah area and rain began to fall throughout the City of St. George (City) and neighboring cities. This intense rainfall event caused significant flooding in the urban areas of St. George City damaging homes, causing erosion to the waterways, and leaving a significant […]