Services

Water

Water is a critical resource, and we ensure its sustainable management. From conservation planning to drinking water systems, we provide solutions for safe and efficient water use.

Our Expertise

BC&A offers comprehensive water engineering services focused on the planning, design, and optimization of water supply, treatment, and distribution systems. Our team delivers sustainable, cost-effective solutions that provide safe, reliable water infrastructure for governments, industries, and the communities they serve.

Expertise

Drinking Water

  • Capital Facilities Plans
  • Chlorine, Fluoridation, and UV Treatment
  • Computer Modeling of Age, Particle, and Chemical Tracing
  • Design of Groundwater Treatment Facilities
  • Design of Raw Water Storage Facilities
  • Design of River Diversion Structures
  • Design of Storage Tanks
  • Design of Surface Water Treatment Plants
  • Distribution System Master Planning
  • Large Diameter Pipeline Design
  • Major Conveyance Facilities Master Planning
  • Pumping and Booster Stations
  • Water Distribution System Hydraulic Modeling
  • Water Metering Structures and Devices
  • Water Rights

Expertise

Irrigation Water

  • Automation of Gates and Regulating Structures
  • Canal Lining
  • Canal Piping Projects
  • Canal Repairs
  • Canal Safety Assessments
  • Diversion Structure Design and Rehabilitation
  • Permitting of Utilities Crossings of Canals
  • Pumping Station Design
  • Secondary Water System Master Planning

Expertise

Dams & Reservoirs

  • Computer Simulation of Dam Breach Scenarios
  • Dam Safety Rehabilitation
  • Design of Dam, Outlet Works, and Spillway Facilities
  • Hydrology Studies
  • Preparation of Emergency Action Plans
  • Preparation of Standard Operating Procedures
  • Reservoir Operation Modeling

Terminal Reservoir Project

View of Terminal Reservoir Project in Salt Lake & Sandy Districts with cloudy mountains in the background
2018

Terminal Reservoir is owned and operated by the Metropolitan Water District of Salt Lake & Sandy (District). The District began planning for replacement of the reservoir in 1998 and worked through the detailed planning and design phases of the project over a three-year period from 2008 to 2011.

Read More ⟶

Water Use Data Collection

Bowen Collins & Associates was tasked with examining municipal and industrial water-use information that was submitted to the State of Utah in 2005, 2010, and 2015.

Read More ⟶